202 suppliers13 provincesFree listings

ValveWormGear · Supplier research

Chengdu Maikesen Fluid Control Equipment Co., Ltd.

Review Chengdu Maikesen Fluid Control Equipment Co., Ltd. in Chengdu, Sichuan: documented drive-device scope, manufacturer evidence, source dates and platform procurement route.

Company record

Published Chinese name
成都迈可森流体控制设备有限公司
Province / city
Sichuan / Chengdu
District / county
Shuangliu
Published address
Exact street address not verified
Business role
Manufacturer
Listing tier
Free
Source review date
2026-10-27

Public-source company identity, location, product scope and business-role review; not a physical factory audit, inventory check or certification validation.

Documented product scope

Gas-over-oil, electro-hydraulic, pneumatic and hydraulic valve actuator families are separately listed. Electric category covers its electro-hydraulic devices only; no conventional geared electric actuator range inferred.

Public contact details

Why this business role is shown

Official company profile identifies production factory premises and development/manufacture of pipeline-valve actuators.

English name is a working translation. Company also documents premises in Meishan; not counted twice as separate suppliers.

Source verification record

Source URLs are shown as plain text for free listings. The review date records a public-document check; it is not a confirmation of current inventory, certification validity or willingness to quote.

  1. https://www.mksvc.com.cn/About.html
    Reviewed 2026-10-27

English identity status: working English rendering; use the published source identity for contracting. Chinese identity status: published company name; current registration status not independently audited.

Confirm before shortlisting

Compare suppliers with overlapping product scope

Post a sourcing need

Prepare a request for the platform to match against documented supplier scope. Include the valve duty, required motion, mounting drawing, quantity and delivery destination. Supplier availability and technical suitability require confirmation.

Prepare a procurement request